Research Concerning the Effect of the Torrential Hydrographic Network Management Works in the Upper Watershed Carcinov River

Authors

  • N. Tudose Transilvania University of Brasov, Romania
  • I. Clinciu Transilvania University of Brasov, Romania

Keywords:

works effect, torrent control, hydrotechnical works

Abstract

Taking into consideration the measurements data one has established that the siltation created by the transverse hydrotechnical works done in the superior watershed of Cârcinov river siltation are extending on a torrential valley length of 840 meters, covering a surface of 1.5 hectares and engaging/accumulating an alluvia volume of approximately 5600 cubic meters. For the three analysis parameters (siltation length, siltation surface and siltation volume) one has established mean unitary values on classes of the clogging height, thus considering that the polynomial function best approximates the general tendency of this mean's variations.

Author Biographies

N. Tudose, Transilvania University of Brasov, Romania

Dept. of Forest Management Planning and Terrestrial Measurement

I. Clinciu, Transilvania University of Brasov, Romania

Dept. of Forest Management Planning and Terrestrial Measurement

Downloads

Published

2010-09-17

Issue

Section

FORESTRY