Foundation solutions of a building on saturated ground, compressible in Brasov city

Authors

  • M. Mantulescu Transilvania University of Brasov, Romania
  • I. Tuns Transilvania University of Brasov, Romania

Keywords:

soil investigation, soil improvement, uniforming the foundation soil

Abstract

Construction of a building with 5 floors on saturated, very compressible ground, without the possibility of water drainage, required further study and monitoring of its behavior in time. Avoiding differencial settelments required cement injection in a rectangular grid with a side of 1.50 m. It was found that injection consumed 60% more solution than the volume of the borehole, which to a diameter of 30 centimeters, with an average porosity of 35%, highlighted a radius of 46 centimeters influential. This article aims to review the phases of research, execution and monitoring the behavior of the construction.

Author Biographies

M. Mantulescu, Transilvania University of Brasov, Romania

Faculty of Civil Engineering, Department of Civil Engineering

I. Tuns, Transilvania University of Brasov, Romania

Faculty of Civil Engineering, Department of Civil Engineering

Downloads

Published

2016-01-22

Issue

Section

CIVIL ENGINEERING