The Influence of Priority Rules in Local Heuristic-Based Job Shop Scheduling

Authors

  • D.I. Bancila Transilvania University of Brasov, Romania
  • C. Buzatu Transilvania University of Brasov, Romania

Keywords:

Scheduling, job shop, heuristic

Abstract

This paper presents the way in which the different priority rules of heuristics affect the maximum completion time for all jobs on all machines in a job shop scheduling problem. Thus, a heuristic algorithm will be used and by the mean of two different priority rules, the final results will be compared.

Author Biographies

D.I. Bancila, Transilvania University of Brasov, Romania

Dept. of Manufacturing Engineering

C. Buzatu, Transilvania University of Brasov, Romania

Dept. of Manufacturing Engineering

Published

2007-01-17

Issue

Section

MECHANICS